Resources | Trilogy
The Latest In High-Performance
Infrastructure Solutions
Find helpful articles and resources from the Trilogy team. Have a topic you’d like featured? Let us know.
Busway vs Whips and Conduit: How to Choose
Busway runs an enclosed conductor rail above the racks, and power taps off it anywhere along the length. Whips and conduit run a dedicated cable to each rack from a panel. The trade is capital cost against change cost: whips are cheaper to install and more expensive...
2N vs N+1 vs N: Data Center Power Redundancy Explained
N is the capacity needed to carry the full load with nothing spare. N+1 adds one redundant component, so a single failure does not drop the load. 2N duplicates the entire system into two independent paths, each able to carry the full load alone, which allows...
How to Size Power for a Data Center Rack
Sizing rack power comes down to five steps: total the actual load rather than the nameplate ratings, convert that load into amps at your supply voltage, apply the continuous load rule that limits a circuit to 80 percent of its rating, divide across phases and across A...
Data Center Power Terms Explained: A Plain-English Glossary
Data center power terminology mixes electrical engineering, IT operations and procurement vocabulary, which is why the same equipment gets three names depending on who is talking. This glossary covers the terms that come up most in real projects: capacity terms like...
Rack PDU Buyer’s Guide: Basic, Metered, Monitored and Switched
Rack PDUs come in roughly five capability tiers: basic distribution, metered at the unit, monitored over the network, outlet-metered, and switched with remote outlet control. Price rises sharply across that range, and most facilities do not need the top tier...
Ten Common Data Center Power Distribution Mistakes
Most data center power problems are not equipment failures. They are design and planning decisions that looked reasonable at the time: sizing to nameplate ratings, forgetting the continuous load derate, treating a 2N pair as additive capacity, running out of breaker...
How to Specify a Data Center Transformer
A transformer specification is built from roughly nine decisions: type, capacity, voltage ratings, winding configuration and vector group, impedance, temperature rise, cooling class, efficiency class and physical envelope. Each affects performance, cost and which...
Long Lead Electrical Equipment: A Pre-Order Checklist
Long lead equipment is anything whose delivery time drives the project schedule rather than following it, which in a data center means transformers, switchgear, generators and UPS. The work that protects a schedule happens before the order goes out: confirming what...
Trilogy's team was able to evaluate our current situation and understand our needs. Sasha and her team would provide frequent updates throughout the procurement process, keeping us in the loop every step of the way. With their help, we were able to distribute power across our operation in a timely manner.
Trilogy's infrastructure consistently meets Core Scientific’s high standards for reliability and performance. Trilogy's PDUs serve a vital function in our operations, providing the stability and efficiency our data centers demand. We are a fast-moving organization, and Trilogy consistently delivers on time to keep up with our supply chain needs. I highly recommend Trilogy for their reliable, high-quality power distribution solutions.
I am incredibly impressed with Trilogy's PDUs for enterprise data centers. Their PDUs are not only reliable but also highly efficient, providing a seamless power distribution system for our data center infrastructure. I highly recommend!








